
[Home] [Introduction] [Administrative setup] [Information Technology] [Industry] [Education] [Health] [Tourism]
[Other Departments] [Telephone Numbers] [Photogallery] [Contact us]
Industry
[Refinary] [Thermal] [NFL] [Nestle]
PANIPAT
THERMAL POWER
STATION
(A UNIT OF HARYANA POWER GENERATION CORPORATION LTD.)
Thermal Power
Station Panipat, a bunching of eight individual units with total installed
capacity of 1360 MW is located about 8 KM in the west of Panipat city on Panipat-Hisar National Highway and is surrounded by cultivated green fields. In
addition, 640 acres of saline waste land is earmarked for disposal of
ash. The plant is equipped with a huge residential colony to ensure availability
of staff and officers round the clock. Unit No. 1 was commissioned on
1st November, 1979 Haryana day by the then President of India
Shri Neelam Sanjeeva Reddy with subsequent commissioning of Units-II,
III, IV, V, VI, VII & VIII. The salient features of the plant are as
under :-
The salient features of
the plant are as under :
|
Capacity |
4x110 MW + 2x210 MW + 2x250 MW =1360 MW |
|
Year/Date of commissioning | |
|
Unit - 1 |
|
|
Unit - 2 |
|
|
Unit - 3 |
|
|
Unit - 4 |
|
|
Unit - 5 |
|
|
Unit - 6 |
|
|
Unit - 7 |
28-09-2004 |
|
Unit - 8 |
28-01-2005 |
|
Daily coal requirement |
21,000 M.T. |
|
Height of cooling Tower |
123.6 Mtr. in Stage-I & II. 143.5 Mtr. in stage-III 141.0 Mtr. in stage-IV 112.5 Mtr. in stage-V |
Performance of Panipat Thermal Power Station (as a whole)
The performance of the station
during the last ten years is tabulated as under :-
|
YEAR |
GENERATION (MU) |
PLANT LOAD FACTOR (%) |
AUXILIARY CONS.
(%) |
OIL CONSUMPTION (ml/kwh) |
COAL CONSUMPTION (kg/kwh) |
|
1997-1998 |
2868.835 |
50.38 |
11.80 |
13.72 |
0.828 |
|
1998-1999 |
2656.030 |
46.65 |
11.75 |
14.22 |
0.824 |
|
1999-2000 |
2856.040 |
50.02 |
11.41 |
6.89 |
0.784 |
|
2000-2001 |
2727.994 |
47.91 |
11.43 |
6.23 |
0.791 |
|
2001-2002 |
4123.94 |
61.86 |
10.67 |
3.04 |
0.769 |
|
2002-2003 |
4992.264 |
66.26 |
10.14 |
3.49 |
0.745 |
|
2003-2004 |
5949.260 |
78.75 |
10.08 |
3.21 |
0.744 |
| 2004-2005 |
5756.5968 |
71.14 |
10.74 |
3.90 |
0.762 |
| 2005-2006 |
8135.6993 |
68.53 |
9.79 |
3.56 |
0.714 |
| 2006-2007 |
9908.1265 |
83.17 |
9.48 |
1.39 |
0.699 |
MAJOR ACHIEVEMENTS OF THE
PLANT (PLANT AS A WHOLE)
The generation & P.L.F. during
the year 2006-07 was 9908.1265 MU & 83.17 respectively which is the highest
since commissioning of all the units.
The auxiliary consumption of the
station during the year 2006-07 was 9.48% which is the lowest since
commissioning of all the units.
The specific oil consumption of
the station during the year 2006-2007 was 1.39 ml/Kwh which is the lowest since
commissioning of all the units.
The specific coal consumption of
the station during the year 2006-2007 was 0.699 Kg/Kwh which is the lowest since
commissioning of all the units.
ACHIEVEMENTS OF STAGE I & II (4X110 MW UNITS) :
110 MW units - 1 to 4 generated 2566.6211 MU(PLF 66.59%) during the year which is the 2nd highest generation since commissioning of all these four units. First highest generation of these units was 2800. 1989 MU (PLF 72.45%) during 2003-04.
Specific oil consumption of 4x110 MW units remained 2.92 ml/kwh which is the lowest specific oil consumption since commissioning of these units.
Specific coal consumption of 4x110 MW units remained 0.842 kg/kwh, which is the 2nd lowest since 1990-91. 1st lowest specific coal consumption of these units after 1990-91 is 0.813 kg/kwh during 2003-04.
Heat rate of unit 1 to 4 remained 3342 kcal/kwh which is the lowest since commissioning of these units.
Unit-1st (110 MW) generated 603.530 MU (PLF 62.63%) during this year which is the 2nd highest generation since commissioning of this unit. First highest generation of this unit is 609.40 MU(PLF 63.09%) during 2003-04.
Unit-2nd (110 MW) generated 745.504 MU (PLF 77.37%) during this year which is the highest generation from this unit since its commissioning.
Unit-4th (110 MW) generated 744.86 MU (PLF 77.30%) during this year which is the 3rd highest generation from this unit since its commissioning. First & Second highest generation are 767.17 MU (P.L.F. 79.67%) during 2005-06 & 758.43 MU (P.L.F. 78.49%) during 2003-04.
Unit-2nd (110 MW) remained in continuous operation from 12-02-07/1336 hrs to 31-03-07/0802 hrs=46 days which is the 1st highest continuous running since commissioning of the unit.
Unit-4th (110 MW) remained in continuous operation from 27-06-06/0705 hrs to 04-11-06/0707 hrs=130 days which is the highest continuous running of any unit of PTPS since 1979 i.e. commissioning of the 1st unit.
ACHIEVEMENTS OF 210 MW
UNIT NO-V :
ACHIEVEMENTS OF 210 MW
UNIT NO-VI :
The Unit was commissioned on coal
firing on
The generation and PLF of 210 MW Unit-VI during the year 2002-03 was 1696.243 MU and 92.21% respectively which is the highest annual generation and PLF record since commissioning of the 210 MW Unit-VI without availing any shutdown.
The specific coal consumption of 210 MW Unit-VI during 2006-07 was 0.675 kg/kwh which is the lowest since commissioning of the Unit-VI.
The specific oil consumption of 210 MW Unit-VI during 2006-07 was 0.54 ml/kwh which is the lowest since commissioning of Unit.
The auxiliary consumption of 210 MW Unit-VI during 2001-02 was 8.94% which is the lowest since commissioning of Unit-VI.
The Heat Rate of 210 MW unit-VI during 2006-2007 remained 2748 Kcal/Kwh which is the lowest since commissioning of the unit-VI.
210 MW Unit-VI remained in
operation continuously for 96 days from
Unit-6th (210 MW) generated 5.346 MU (PLF 106.07%) on dated 10/08/2006 which is the highest one day generation from this unit after its commissioning.
ACHIEVEMENT OF 250 MW UNIT NO-VII :
The unit was commissioned on coal firing on 28-09-2004 & dedicated on commercial run w.e.f. 29-12-2004.
Unit-7th (250 MW) generated 1977.9204 MU (PLF 90.32%) during 2006-2007 which is the highest generation from this unit after its commissioning.
Monthly highest generation of Unit-7th (250 MW) remained 189.034 MU (PLF 101.63%) during 01/2007 which is the highest during a month since commissioning of this unit.
%age Aux. Consumption of Unit-VII remained 8.44% during this FY. Earlier lowest Aux. Consumption was 9.76% during 2004-2005
Specific coal consumption of Unit-VII remained 0.628 Kg/Kwh during this FY, which is the lowest since its commissioning.
The Heat Rate of unit-VII remained 2507 Kcal/kwh which is the lowest since commissioning of the unit.
Unit-7th
(250 MW) remained in continuous
operation from
ACHIEVEMENTS OF 250 MW UNIT NO-VIII :
The unit was commissioned on coal firing on 28-01-05 & dedicated on commercial run w.e.f. 08-04-2005.
Unit-8th (250 MW) generated 1998.078 MU (PLF 91.24%) during 2006-2007 inspite of availing S/D of 15 days (02-11-2006 to 15-11-2006) which is the highest generation from this unit after its commissioning. Earlier highest Gen. was 1832.5808 MU during 2005-2006 without S/D.
Monthly highest generation of Unit-8th (250 MW) remained 189.130 MU (PLF 101.68%) during 03/2007 which is the highest during a month since commissioning of this unit.
Sp. coal consumption of Unit-VIII remained 0.6226 Kg/Kwh during this FY, which is the lowest since its commissioning.
The Heat Rate of unit-VII remained 2502 Kcal/kwh which is the lowest since commissioning of this unit.
Unit-8th
(250 MW) remained in continuous
operation from
AWARDS &
APPRECIATIONS :
Meritorious Productivity Awards
given by Ministry of India
|
Year |
Amount |
Basis |
|
1991 |
Rs. 1.86 lacs |
Better performance |
|
1992 |
Rs. 8.59 lacs |
Reduction in fuel oil consumption. |
|
1996-97 |
Rs. 1.60 lacs |
Better performance. |
|
2000 |
Rs. 6.67 lacs |
Reduction in Fuel oil consumption. |
|
2000 |
Rs. 1.60 lacs |
Reduction in Auxiliary consumption. |
Appreciation by Honorable
Prime Minister of
Appreciation of Honorable Prime Minister of India was conveyed by the Secretary, Ministry of Power, Govt. of India to Chairman HSEB for achieving targets during the first half of year 1997-98 (Target fixed by CEA for first half of the year 1997-98 was 1278 MU against which actual generation was 1367.294 MU).
Appreciation by his Excellency President of India :
Panipat Thermal Power Station was awarded letter of appreciation by His Excellency President of India at Vigyan Bhawan New Delhi on dated 24-08-2004 for good performance of plant during year 2003-04.
GOLD SHIELD BY GOVT. OF
INDIA :
Gold Shield was awarded by Govt. of India to MD/HPGCL for early completion of 250 MW, Unit 8 of Panipat Thermal Power Station during the year 2004-2005.
Special Incentive by
H.S.E.B. :
HSEB awarded special incentive of
10 days pay to all employees of the plant for achieving record generation during
1996-97 (2753.631MU against target of 2700 MU) and 1997-98 (2868.835MU against
target of 2800MU)
Special Incentive by
HPGCL :
HPGCL awarded special incentive of 7 days pay to all employees of the plant for achieving outstanding performance during the year 1999-2000. In addition to this HPGCL awarded Special incentive of one day pay to all the employees of plant for achieving 99.34% PLF on dated 05-02-2004.
*******
[Refinery] [Thermal] [NFL] [Nestle]
[Home] [Introduction] [Administrative setup] [Information Technology] [Industry] [Education] [Health] [Tourism]
[Other Departments] [Telephone Numbers] [Photogallery] [Contact us]